home
 

Investment fee

Land Lease:
Land price will be offered based on industrial categories and investment scale. The land lease period (for industrial use) is 50 years.

Rent of Standard Factory Building:
RMB 10-12 yuan/month/m2

Power Supply:
Price: Peak time RMB 0.639yuan/KWH (08:00-22:00)
Valley time RMB 0.417yuan/KWH (22:00-08:00)


Water Supply:
Residential Use Fee : RMB 1.1 yuan/ M3
Dyeing and building industry : RMB 1.9 Yuan/ M3
General industry : RMB 1.40 yuan/ M3(not including wastewater discharging fee)
Restaurant : RMB 2.5 yuan/ M3

Thermal Power Supply:
Pipe line construction fee:150,000yuan/T(lump.sum)
Average price 130yuan/T

Wastewater Interconnection Fee:

RMB 250 yuan/T (lump sum)

Building Construction Fee:
Steel Structure: RMB 450-550 yuan/ M2 (For reference)
Brick Structure: RMB 500-600 yuan/ M2 (For reference)


Salaryworker:

RMB 620-1000 yuan/month (For reference)
College Graduate RMB 1000-1500 yuan/ month (For reference)


Insurance:
Job Injure Insurance: 0.5%,0.8%and 1.2% of the provincial average wage of employees of last year
Endowment Insurance: 24% of 60-300%of the provincial average wage of the employees of last year(8% charged by employee-self)
Unemployment Insurance: 3% of the 60-300% of the provincial average wage of the employees of last year(1% charged by employee-self)
Basic Health-care Insurance: 5% of the provincial average wage of the employees of last year(plus 3yuan monthly of personal large-sum healthcare insurance)
Birth Insurance: 0.5% of the provincial average wage of the employees of last year
Fees That Is Free of Charge During the Plant Construction:
Land-using fee, planning management fee, urban facilities fee,
power and water capacity increasing fee and interim transformer fee.




 Transportation 
 Infrastructure 
 Investment Fee
 Investment Policy
 Investment Guidance
 Human Resource
 Facility Service
 Investment Procedure
 
Copyright(c)2005 The Administrative Committee of Xiaoshan Economic & Technological Development Zone All Rights Reserved .