|
Infrastructure
XETZ has complete construction in
road, communication and internet, power and water supply,
sewage and rain water discharge, land leveling etc.
Water
Supply: The daily water supply capacity
is 360,000 tons.
Electric
Power: Two substations of 110KV
and 35KV ensure the double loop supply.
Thermal
Power: The maximum supply of thermal
power is 160tons/hour.
Water
Discharge:The rainwater and the
waste water are discharged separately, and the clean water
and waste water are as the same.
|